The Philippine Environmental Impact Assessment System (PEIAS) requires all new environmental-critical projects to conduct an environmental impact assessment (EIA) where results shall be written in either an Environmental Impact Statement (EIS), Initial Environmental Examination Report (IEER) or an Environmental Performance Report and Management Plan (EPRMP) and submitted to the Environmental Management Bureau (EMB) to secure an Environmental Compliance Certificate (ECC). The ECC requirements in the Philippines are typical of other countries that have already adopted the EIA process in ensuring all projects in the country have considered the environmental impacts in its planning so that the necessary mitigating measures and enhancements are put in place from the beginning.
To secure an ECC in the Philippines, there are environmental consulting engineers and companies who can prepare all the necessary requirements including the report preparation and liaising until the ECC is secured. Pacific Spectrum Environmental is an environmental engineering and consultancy company that caters to this requirement.
Contact us today!
Telephone No.: (632) 624-5826 / 637-8669
Mobile Number: (63 917) 5555-823
Telefax No.: (632) 631-2096
Email: info@pacific-spectrum.com
______________________________
PACIFIC SPECTRUM ENVIRONMENTAL
Research and Consultancy, Inc.
Unit 1534 City and Land Mega Plaza
ADB Avenue corner Garnet Road
Ortigas Center
Pasig City 1605
Metro Manila, Philippines
Visit our main site at
www.pacific-spectrum.com.